Site Installation Works for “ELECTRO MECHANICAL PACKAGE” at PARE H.E.P. (2 X 55 MW) in Arunachal Pradesh.
Tala HEP, Bhutan
Modificaton of Tala Surge shaft Gates Hoisting Mechanism and its Latching arrangement.
Tanakpur, Uttarakhand
Dismanteling of Unit # III, replacement of Runner, Assembly and Installation of Unit at Tanakpur Power Station, Banbassa, Uttarakhand
Kuruchu, Bhutan
Erection, Testing and Commissioning of Mechanical, Hydraulic & Electrical Equipments and associated switchyard equipments of Unit I, II, III and IV at KHEP Bhutan
Penstock, Orifice, Bend, Transition Fabrication for 48 MW x 2 Rognichu Hydro Electric Project, Sikkim (MBPCL)
Penstock Fabrication - 3 Metre Dia, Steel Grade 517F