Package 1 Completed 3 Months before Schedule.
Argon Welding - Air Ventilator Pipe
Fixing of Bolts for Pressure Testing using Torque Multiplier
Distributor Welding and Grinding
Draft Tube Erection
Erection of Spiral
Preparation for lowering of head cover assembly
Lowering of Stator in generator pit
Center marking of EOT hook for rotor lowering
Lowering of head cover
Heating of stator bottom bar for HV testing.
Final pressing of rimsheets of rotor is completed.